Rescheduling of Flexible Flow Shop with Sequence-Dependent Setup Times and Job Splitting
Identify four different sequencing problems with poorly assigned job sequences and unnecessary idle times in each schedule derived from dispatching rules. Solve these problems by reconfiguring or splitting the sequence of jobs.